Redesigning the riverfront

dock construction

Work on the swim dock and the riverbank, late June 2011.

As noted here in May, the reconfiguration of the dock and the surrounding bank carries out a riverfront landscape plan that was published in March.

This project is not a new idea; it was called for a decade ago on pages 26 and 27 of the college’s Landscape Master Plan (pdf). Tuck Mall was the first zone named in that plan to receive a reworking.

Leave a Reply

Your email address will not be published. Required fields are marked *