Ledyard Bridge as case study

One learns from an abstract of a Quebec conference paper titled “Le Remplacement du Pont de Ledyard” that each of the four piers and abutments of the late-1990s Ledyard Bridge required a different type of foundation construction, since the riverbed and bedrock at that crossing are so irregular.

Leave a Reply

Your email address will not be published. Required fields are marked *